Made for Electricians
Write Customer Updates for Every Critical Job Moment
Draft a complete set of clear, fact-checked customer messages for the moments when electrical jobs are most likely to create confusion or conflict.
Create a free account to save your progress and use this Playbook.
Use this when
You need consistent customer updates across an active electrical job, especially when timing, shutdowns, hidden conditions, added work, inspection status, payment, or follow-up could affect trust and margin.
You'll need
- Job summary
- Customer and property context
- Message pack scope
- Schedule and access details
- Discovered conditions
- Scope and approval status
- Current job status
- Payment and follow-up details
- Communication voice
You'll get
- Every applicable critical job moment mapped
- Every ready-to-send message tied to confirmed facts
- Every pending fact and customer decision clearly labeled
- Every added-work request separated from the original scope
- Every timing, inspection, completion, and payment claim checked
- A reusable pre-send checklist completed.
By the end of this playbook
You will have:
- Every applicable critical job moment mapped
- Every ready-to-send message tied to confirmed facts
- Every pending fact and customer decision clearly labeled
- Every added-work request separated from the original scope
- Every timing, inspection, completion, and payment claim checked
- A reusable pre-send checklist completed.
Sample
This is sample data, not your prompt. Pro unlocks this higher-stakes Playbook. On Free Playbooks you can still copy the assembled prompt into any AI.
Sample input
Job summary: Replace a damaged 200-amp exterior panel at an occupied home. The approved scope includes the panel, breakers, grounding updates, permit, and utility coordination. Customer context: Two adults work from home. Refrigerated medication requires advance notice before a shutdown. Text is preferred for timing; email is required for approvals. Message pack: Full customer update pack. Schedule: Thursday arrival from 7:30 to 8:00 a.m. Planned outage from 9:00 a.m. to 3:00 p.m., with reconnect controlled by the utility. Discovered condition: Possible service mast corrosion that can't be confirmed until setup. Approval: No mast work is approved. A written change order will be sent if replacement is needed. Status: Permit issued. Inspection hasn't occurred. Payment: Final invoice due on receipt after completion. Voice: Direct and reassuring.
Sample assembled prompt
FACT CONTROL Confirmed: Thursday arrival is... The approved scope covers the panel,... The permit is issued. Pending: Actual utility reconnect time, service... Customer decision needed: Written approval only... Don't claim yet: Guaranteed 3:00... power restoration, failed mast, passed inspection,... APPOINTMENT CONFIRMATION Hi Jordan, we're confirmed... Please keep the driveway and panel... The planned power interruption is 9:00... to 3:00 p.m., but final reconnection... Because refrigerated medication is in the... I'll text if the utility window... DISCOVERED CONDITION During setup, we found... We need a closer check before... Mast replacement isn't included in the... If added work is recommended, I'll... No added work will proceed without... PRE-SEND CHECK Customer and property confirmed. Arrival window checked. Shutdown described as planned rather than... Added work separated from approved scope. Inspection status not overstated. Next update time included.