Check Demolition Scope Before Pricing
Review demolition limits, safety dependencies, responsibilities, exclusions, and unknowns before carrying costs into the estimate.
We'll use them to write your prompt.
Make Your Play
Give us the situation. We’ll build the prompt.
Catch unclear removal limits and costly handoff gaps before pricing.
Your answers save as you type.
What you'll do
This is the plan inside your prompt. Add your details first. Then follow these steps with ChatGPT or Claude.
Make Your Play
Check Demolition Scope Before Pricing
Tell us what the prompt needs to know
Start with the questions below. Each answer personalizes the playbook and builds the prompt you’ll use at the end.
Your situation
Describe the project type, location, occupancy, bid stage, schedule limits, and demolition areas.
0/10000
Paste or summarize the demolition work currently shown, specified, or requested.
0/10000
List the drawings, specifications, addenda, proposals, photos, and walkthrough notes available for review.
0/10000
Describe access, occupied areas, items to remain, utility concerns, structural concerns, and disposal limits.
0/10000
Select the current hazardous material testing status.
List known owner duties, trade responsibilities, exclusions, allowances, and concealed-condition terms.
0/10000
This playbook was updated. Review your inputs before copying.
What you'll do
Check a step when you finish it.
Fill in the fields above to generate your prompt preview.
Assembled prompt
Beginner instructions
Gather the latest drawings, specifications, addenda, walkthrough notes, and subcontractor proposal before starting.
If a detail is unknown, write “not confirmed” instead of guessing. Treat safety, structural, utility, and hazardous material questions as hold points for qualified review.
Advanced instructions
Run the review against bid packages and trade proposals separately, then compare the results. Track every conflict back to its source and convert unresolved quantity risk into an allowance, unit price, alternate, or pricing hold.
Use this when
You are pricing renovation or demolition work and the drawings, specifications, walkthrough notes, or owner directions leave room for interpretation.
You'll need
- Project context
- Current demolition scope
- Source documents and notes
- Known site conditions
- Hazard testing status
- Responsibility terms
You'll get
- Every demolition area tied to a source or written assumption
- Removal limits and items to remain clearly separated
- Protection, salvage, disposal, utility, support, and patching responsibilities addressed
- Hazardous material and concealed-condition handling documented
- Every unresolved item assigned a pricing treatment
- Written clarification questions ready to send.
By the end of this playbook
You will have:
- Every demolition area tied to a source or written assumption
- Removal limits and items to remain clearly separated
- Protection, salvage, disposal, utility, support, and patching responsibilities addressed
- Hazardous material and concealed-condition handling documented
- Every unresolved item assigned a pricing treatment
- Written clarification questions ready to send.