Price a Small Commercial Tenant Fit-Out From Walkthrough to Quote

Made for Electricians

Price a Small Commercial Tenant Fit-Out From Walkthrough to Quote

Also useful for: people in Skilled Trades

150 min Advanced Planning Planning a Renovation

Build a defensible commercial fit-out quote from drawings, field conditions, takeoff quantities, labor allowances, and unresolved scope questions.

We'll use them to write your prompt.

Make Your Play

Give us the situation. We’ll build the prompt.

Price a tenant fit-out without relying on plan counts alone.

Your answers save as you type.

What you'll do

This is the plan inside your prompt. Add your details first. Then follow these steps with ChatGPT or Claude.

01 Lock the document set Establish exactly which plans, specifications, schedules, and addenda control the estimate before counting work.
02 Map the electrical scope Break the job into priced, excluded, allowed, alternate, by-others, and unresolved work packages.
03 Reconcile plans with the walkthrough Compare design intent with the actual ceiling, panel, access, occupancy, and demolition conditions found on site.
04 Build the takeoff Count the installable electrical components and separate confirmed quantities from assumptions.
05 Check equipment feeds Trace mechanical, plumbing, kitchen, signage, and owner equipment requirements that commonly fall between drawings.
06 Price materials and outside costs Connect quantities to current pricing while separating firm quotes, database prices, allowances, and missing vendor coverage.
07 Build labor and access allowances Price the work by task and adjust for the real conditions of the space instead of using one broad labor factor.
08 Resolve or price the unknowns Turn unresolved scope into direct questions, bounded allowances, or explicit exclusions before the price is committed.
09 Assemble the quote Convert the estimate into a clear commercial offer with a defined base scope and controlled qualifications.
10 Run the final estimate check Pressure-test the full quote for omissions, duplicated costs, arithmetic errors, unsupported assumptions, and unacceptable exposure.

Use this when

You're pricing a small office, retail, clinic, restaurant, or similar tenant fit-out and need to reconcile the plans with actual site conditions before submitting a quote.

You'll need

  • Project type
  • Project stage
  • Project documents
  • Walkthrough notes
  • Requested scope
  • Labor assumptions
  • Material pricing basis
  • Access and schedule
  • Known qualifications
  • Quote requirements

Fill these in the prompt workspace.

You'll get

  • Plan scope and field conditions reconciled
  • Major quantities recorded and checked
  • Equipment feeds assigned or flagged
  • Labor allowances tied to installable tasks
  • Access, schedule, and phasing costs addressed
  • Price-critical questions documented

By the end of this playbook

You will have:

  • Plan scope and field conditions reconciled
  • Major quantities recorded and checked
  • Equipment feeds assigned or flagged
  • Labor allowances tied to installable tasks
  • Access, schedule, and phasing costs addressed
  • Price-critical questions documented
Suggest an idea

What should we add?

Loading the suggestion form…