Made for Electricians
Run an Added-Work Approval Workflow
75 min
Advanced
Electrician
Improve Operations
Career outcome:
Avoid Professional Risk
Move added electrical work through a clear stop, document, price, approve, schedule, install, and bill process.
Create a free account to save your progress and use this Playbook.
Use this when
You discover a hidden condition, receive a customer change request, or identify electrical work that falls outside the signed scope.
You'll need
- Job and customer
- Original contracted scope
- Added-work trigger
- Field findings
- Safety and work status
- Proposed added scope
- Labor estimate
- Material and outside costs
- Pricing rules
- Schedule effect
- Approval details
- Billing requirements
You'll get
- The added-work trigger recorded with date, location, and evidence
- The original scope compared against the proposed added scope
- Safety and commercial approval decisions separated
- Labor, material, schedule, and pricing effects documented
- Written authorization tied to the exact scope and price
- Schedule and crew handoffs updated after approval
By the end of this playbook
You will have:
- The added-work trigger recorded with date, location, and evidence
- The original scope compared against the proposed added scope
- Safety and commercial approval decisions separated
- Labor, material, schedule, and pricing effects documented
- Written authorization tied to the exact scope and price
- Schedule and crew handoffs updated after approval
Sample
This is sample data, not your prompt. Pro unlocks this higher-stakes Playbook. On Free Playbooks you can still copy the assembled prompt into any AI.
Sample input
A dental-office renovation uncovered crushed conduit above Exam 4. The affected pull was stopped. The signed scope covers replacement circuits but excludes repair of damaged existing raceways. The proposed work requires new EMT, fittings, conductors, 12 total labor hours, and one additional day if approval arrives after noon. The superintendent may approve up to $2,500 by signed form or email.
Sample assembled prompt
STATUS: BLOCKED PENDING WRITTEN APPROVAL Field... Repair of damaged existing raceway is... We propose replacing approximately 22 feet... The price and supporting breakdown are... Approval by noon keeps the current... Please reply with written approval of... Next action: Confirm the permit effect,...