Made for General Contractors
Walk the Job Before Scope Signoff
Confirm what stays, what changes, what's excluded, and who owes each decision before the project starts.
We'll use them to write your prompt.
Make Your Play
Give us the situation. We’ll build the prompt.
Catch scope gaps where they usually hide: room boundaries, trade handoffs, owner selections, allowances, protection work, finishes, and closeout expectations.
Your answers save as you type.
What you'll do
This is the plan inside your prompt. Add your details first. Then follow these steps with ChatGPT or Claude.
Make Your Play
Walk the Job Before Scope Signoff
Tell us what the prompt needs to know
Start with the questions below. Each answer personalizes the playbook and builds the prompt you’ll use at the end.
Your situation
Describe the project, property, major work, current phase, and planned mobilization.
0/10000
Enter the planned start or mobilization date.
List or upload the contract, proposal, plans, specifications, selections, addenda, and messages that define the work.
0/10000
List every interior room, exterior area, access route, staging area, and shared boundary that needs review.
0/10000
List unresolved selections, allowances, owner requests, scope questions, access issues, and suspected conflicts.
0/10000
Paste the document priority, notice, approval, allowance, owner responsibility, delay, and change-order rules that apply.
0/10000
Enter or upload room-by-room observations, measurements, photos, owner comments, and decisions captured during the walkthrough.
0/10000
Select the method required for written owner approval.
This playbook was updated. Review your inputs before copying.
What you'll do
Check a step when you finish it.
Fill in the fields above to generate your prompt preview.
Assembled prompt
Beginner instructions
Collect the signed proposal, plans, specifications, selection sheets, allowances, and recent owner messages before starting. Walk one room at a time and record exact decisions instead of relying on memory.
Advanced instructions
Use the document priority rules in the contract, preserve source references for every material decision, and separate clarification from added work. Route design, code, engineering, and legal conflicts to the qualified party responsible for them.
Use this when
You are preparing to start a renovation, build-out, or repair project with several rooms, trades, selections, allowances, or owner responsibilities still in play.
You'll need
- Project summary
- Start date
- Scope sources
- Rooms and work areas
- Known open items
- Contract controls
- Walkthrough notes
- Approval method
You'll get
- Every room and work area reviewed
- Existing conditions, demolition, new work, finishes, and protection confirmed
- Exclusions and assumptions written in plain language
- Allowances and selections classified by status
- Owner deliverables paired with deadlines
- Potential changes separated from current scope
By the end of this playbook
You will have:
- Every room and work area reviewed
- Existing conditions, demolition, new work, finishes, and protection confirmed
- Exclusions and assumptions written in plain language
- Allowances and selections classified by status
- Owner deliverables paired with deadlines
- Potential changes separated from current scope