Made for Architects

Record Your Key Design Decisions and Tradeoffs

Also useful for: Project Managers, people in Creative

30 min Intermediate Decisions Make a Decision Need to Make a Decision

Create a reusable decision record that explains what you chose, why you chose it, what you gave up, and when the choice should be reviewed.

We'll use them to write your prompt.

Make Your Play

Give us the situation. We’ll build the prompt.

Keep important reasoning from disappearing into meeting notes, emails, and drawing revisions.

Your answers save as you type.

What you'll do

This is the plan inside your prompt. Add your details first. Then follow these steps with ChatGPT or Claude.

01 Build Your Decision Fact Pack You pull the decision, options, constraints, evidence, and confirmation details into one fact set before drafting the record.
02 Generate Your Decision Record You turn your fact pack into a structured record that explains the choice and its consequences.
03 Confirm and File Your Record You close any factual gaps, secure confirmation, and connect the record to your active project documents.

Use this when

Use this after a major layout, system, material, code, cost, or scope decision. You can also use it when a choice has changed or needs formal confirmation.

You'll need

  • Project name
  • Decision topic
  • Decision status
  • Chosen direction
  • Options considered
  • Requirements and constraints
  • Evidence used
  • Accepted tradeoffs
  • Confirmation details
  • Revisit conditions
  • Source notes

Fill these in the prompt workspace.

You'll get

  • One decision statement, at least two options or a documented reason only one option was viable, the evidence used, accepted tradeoffs, confirmation status, and a clear revisit trigger
  • You can trace every factual claim to your notes or mark it for confirmation.

By the end of this playbook

You will have:

  • One decision statement, at least two options or a documented reason only one option was viable, the evidence used, accepted tradeoffs, confirmation status, and a clear revisit trigger
  • You can trace every factual claim to your notes or mark it for confirmation.

Part of a collection

Turn the Brief Into a Real Design Problem

10 playbooks

You clarify what the project needs, who can shape it, which constraints matter, and what deserves your design attention first.

Next: Run Your First Brief-Clarification Meeting

View collection

Best next playbooks

Suggest an idea

What should we add?

Loading the suggestion form…