Record Your Key Design Decisions and Tradeoffs
Also useful for: Project Managers, people in Creative
Create a reusable decision record that explains what you chose, why you chose it, what you gave up, and when the choice should be reviewed.
We'll use them to write your prompt.
Make Your Play
Give us the situation. We’ll build the prompt.
Keep important reasoning from disappearing into meeting notes, emails, and drawing revisions.
Your answers save as you type.
What you'll do
This is the plan inside your prompt. Add your details first. Then follow these steps with ChatGPT or Claude.
Make Your Play
Record Your Key Design Decisions and Tradeoffs
Tell us what the prompt needs to know
Start with the questions below. Each answer personalizes the playbook and builds the prompt you’ll use at the end.
Your situation
Enter your project name or internal project number.
Name the exact design question you resolved.
Choose where your decision stands now.
State what you chose and when you chose it.
0/10000
List your realistic options and a short note about each one.
0/10000
List your program needs, site limits, code issues, budget limits, schedule needs, and stakeholder priorities.
0/10000
Provide the drawings, studies, estimates, meetings, observations, or requirements that supported your choice.
0/10000
State what your selected option improves and what you knowingly give up.
0/10000
Record who confirmed your decision, each person's role, the date, and any conditions. Note if confirmation is pending.
0/10000
Set the date, milestone, cost change, code finding, or new fact that should reopen your decision.
0/10000
Paste your supporting notes, email excerpts, or document references.
0/10000
This playbook was updated. Review your inputs before copying.
What you'll do
Check a step when you finish it.
Fill in the fields above to generate your prompt preview.
Assembled prompt
Beginner instructions
Start with one decision that has already been discussed. You can paste rough notes instead of writing polished answers. Mark anything you aren’t sure about as unknown rather than guessing.
Advanced instructions
You can use one record for each decision that could affect drawings, coordination, approvals, cost, schedule, or future changes. Add your project decision ID and link the final record to your drawing issue, model revision, meeting record, or change log.
Use this when
Use this after a major layout, system, material, code, cost, or scope decision. You can also use it when a choice has changed or needs formal confirmation.
You'll need
- Project name
- Decision topic
- Decision status
- Chosen direction
- Options considered
- Requirements and constraints
- Evidence used
- Accepted tradeoffs
- Confirmation details
- Revisit conditions
- Source notes
You'll get
- One decision statement, at least two options or a documented reason only one option was viable, the evidence used, accepted tradeoffs, confirmation status, and a clear revisit trigger
- You can trace every factual claim to your notes or mark it for confirmation.
By the end of this playbook
You will have:
- One decision statement, at least two options or a documented reason only one option was viable, the evidence used, accepted tradeoffs, confirmation status, and a clear revisit trigger
- You can trace every factual claim to your notes or mark it for confirmation.